Project description

During large storm events, high flows could result in loss of seal, road embankment and downstream batters constructed either side of Culvert 117 as a result of flows overtopping the embankment.

Construction of a 350mm x 800mm deep reinforced concrete cut of wall on the downstream hinge point of the embankment above Culvert 117 with associated dumped rock embankment protection. Ch 4203 – Ch 4283 (80m), as detailed on plan 7994-051 rev D LRCI is funding the balance of this project.

Total cost of proposed project is $232,284

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.