• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Nov 2025 - Jun 2026
  • Estimated project cost $174,720
  • Australian Government contribution $174,720
  • Local Council/Shire Tenterfield Shire Council
  • State NSW

Project description

Road seal in relatively poor condition and road pavement requires minor patching works prior to full width reseal of 6 metres.

Red Hill Road is a connector road between between Torrington Road and Pyes Creek Road, Stannum connecting the area to the New England Highway at Bolivia. This 3640 metres, 6 metres wide sealed section of road is currently in poor condition and requires minor patching works and full width reseal works. This proposed interventional treatment will preserve the pavement integrity and avoid costly repairs if reseal works are delayed.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.