The sealed shoulders in High Street are in poor condition and have poor cross fall to the kerb and channelIt is proposed to reconstruct the sealed shoulders, improve the current cross fall and replace the kerb and channel to improve the existing drainageTotal cost of proposed project is $2,400,000
This bridge is a concrete arch structure with significant spalling which exposes the steel reinforcing. there is also repair work required on the deck and guard railIt is proposed to undertake concrete repair work all the spalling to ensure the steel reinforcing is protected, carry out maintenance to the deck and repair and re paint the guard rail
Failed and uneven pavement at the end of its useful life.Fully reconstruct
The sections of Toongarra Road which adjoin to either end of this portion are undergoing reconstruction and upgrade works and this section remains of lower standard. This section of the road pavement is also in poor condition due to its age and needs to be reconstructed.Reconstruction and upgrade of a 180m section of road to a two lane road with lanes of 3.5m width. Works include pavement rehabilitation, shoulder widening, lighting, some drainage improvement, kerb and channeling and delineation.Total cost of proposed project is $1,388,548
Failed and uneven pavementSignificant areas of stabilisation and drainage improvement
Pavement at end of life with extensive failures along whole section - heavy truck volumes increase wearFull rehabilitation is required, this consists of digging out and replacing the full pavement and applying a new sprayed seal surface.Total cost of proposed project is $852,167