Oxidised seal at the end of its useful life.Reseal
Oxidised seal at the end of its useful lifeReseal
Pavement is past its 15 year life cycle. There is inadequate grip on the surface and road is becoming slippery in wet weather conditions.Reseal of pavement to improve longevity of roadTotal cost of proposed project is $32,100
Pavement is past its 15 year life cycle by showing signs of cracking and pot-holing.Reseal of pavement to improve longevity of roadTotal cost of proposed project is $22,110
Pavement is past its 15 year life cycle by showing significant cracking especially at the northern end.Reseal of pavement to improve longevity of roadTotal cost of proposed project is $18,386
Pavement is past its 15 year life cycle by showing cracking and pot-holing.Reseal of pavement to improve longevity of roadTotal cost of proposed project is $20,492
Pavement is located in industrial area and is subject to high volume heavy vehicle traffic on a daily basis. Pavement surface showing significant rutting and depressions.Asphalt overlay on pavement to suit industrial areaTotal cost of proposed project is $25,643
Pavement is past its 15 year life cycle by showing signs of pot-holing.Reseal of pavement to improve longevity of roadTotal cost of proposed project is $21,120
Pavement is past its 15 year life cycle by showing signs of oxidisation.Reseal of pavement to improve longevity of roadTotal cost of proposed project is $12,150