Narrow seal and pavement failure creating potential traffic hazardReconstruct pavement and widen seal to seven metres wideTotal cost of proposed project is $150,000
A Collector road in poor condition (including pavement & seal failures). the road is located in a growing Industary area place higher demand on the road.Mill out seal and dispose, excavate pavement, stablize subbase and place new pavement and seal.Total cost of proposed project is $650,752
Local road in poor condition (Including Kerb, Seal and Pavement) with lack of drainage, some parts have kerb and some parts have table drainsFull road reconstruction including pavement, seal, kerb and drainage.Total cost of proposed project is $1,186,886
Access road in poor condition (Including Kerb, Seal and Pavement)Rehab road including Kerb Seal and PavementTotal cost of proposed project is $151,326
The existing road has a this gravel pavement which becomes slippery and potholed in wet conditions.Apply a 100mm thick compacted gravel re-sheet along the full length of the road segment
Stop reflective cracking from rigid pavement belowRehabilitation of the existing road pavement/widening
This arterial dirt roads require regular maintenance and restoration work to rectify both natural deterioration & that caused by regular use. The road has severe to moderate potholing in various parts as well as significant corrugation and rutting. The road surface has become fragmented resulting in excessive loose gravel and other material. In addition some parts of the road are seriously overgrown with roadside vegetation and weeds growing through the road surface.
These problems represent significant safety hazards for road users including Oak Valley community members, service providers, suppliers, mining workers, tourists and other travellers due to the poor condition of the road and increased risk of collision with camels and other large animals emerging from the overgrown parts of roadsides.Grading and other remedial work including filling holes, clearing roadside and road surface vegetation, re-widening, watering and rolling. Grading will commence at railway intersection of Ooldea road and Trans-Australian railway line to the Western Australian border. Proposed area graded is 310km
This project involved the upgrade of the existing arterial road network and Long Street to provide a heavy vehicle bypass of the Leongatha town centre in south east Victoria.
The project strengthened eight bridges on the Monash Freeway from Ferntree Gully Road to Gladstone Road.
The project involved the strengthening of four bridges on the Western Freeway from Bacchus Marsh to Ballan.