Road is cracked and kerbing height is not standard on the south side.Remove and replace existing semi-mountable kerb on south side along the whole section. Remove and replace existing footpath between Regina Road East and Adams Court (south side). Adjust drainage pits. Apply crack sealing and reseal with 25mm Stone Mastic Asphalt (SMA7).
Road is cracked and kerbing height is not standard.Remove kerb and replace with mountable kerb along north side. Remove footpath and replace along north side. Reseal with 25mm dense graded asphalt (AC7).
Road surface requires re-treatment. Kerbing height is not standard.Remove kerb and replace with mountable kerb along north side. Remove footpath and replace along north side. Reseal with 25mm dense graded asphalt (AC7).
Road surface requires re-treatment. Kerbing height is not standard.Reseal long section with 25mm dense graded asphalt (AC7). Reseal intersection with Fancote Street with 50mm dense graded asphalt (AC14).
To address the structural integrity of the road pavement due to soil movement from very reactive soil and there are some drainage concerns. This road has a severe environmental deformation and cracking with moderate load induce cracking. Surface texture has a severe defect. Council's Pavement Management System has indicated that this road is warranted for total road reconstruction.The work will involve a full road reconstruction by total excavation of road base and replacement with a deeper granular pavement to ensure the structure and integrity of the road from possible future soil movement. These work will involve replacing existing kerbs, driveway, traffic control and improving the drainage system. The road pavement being treated is 656m in length and 9m in width.Total cost of proposed project is $536,637
Deformed pavement, shoulder failures, seal failuresStabilise with slag lime, reshape, add 100mm roadbase and seal with a two coat seal.
To address the structural integrity of the road pavement due to soil movement from very reactive soil and there are some drainage concerns. This road has a severe environmental deformation and cracking with moderate load induce cracking. Surface texture has a severe defect. Council's Pavement Management System has indicated that this road is warranted for total road reconstruction.The work will involve a full road reconstruction by total excavation of road base and replacement with a deeper granular pavement to ensure the structure and integrity of the road from possible future soil movement. These work will involve replacing existing kerbs, driveway, traffic control and improving the drainage system. The road pavement being treated is 175m in length and 9m in width
To address the structural integrity of the road pavement due to soil movement from very reactive soil and there are some drainage concerns. This road has a severe environmental deformation and cracking with moderate load induce cracking. Surface texture has a severe defect. Council's Pavement Management System has indicated that this road is warranted for total road reconstruction.The work will involve a full road reconstruction by total excavation of road base and replacement with a deeper granular pavement to ensure the structure and integrity of the road from possible future soil movement. These work will involve replacing existing kerbs, driveway, traffic control and improving the drainage system. The road pavement being treated is 255m in length and 7m in widthTotal cost of proposed project is $390,150
Pavement deformation, shoulder failures and seal failuresStabilise with slag lime, add 100mm of road base, shape and compact, apply two coat seal
There is a narrow bridge at the work location over the Waroona Main Drain. The bridge is of insufficient width to cater for modern traffic and has long been a safety concern to road users.Replacement of the existing bridge with a precast box culvert structure which will allow an adequate and appropriate road width. Reconstruction of some 320 metres of Coronation Road to tie in with the new culvert structure.Total cost of proposed project is $1,269,000