The surface is stripped and cracked.The road will be resealed with 10mm aggregate and the cul-de-sac will be overlayed with a 25mm thick asphalt.
Safety issue in relation to traffic and issues. Additionally the pavement is approximately 30 years old and is showing signs of stress. This includes stripping and deep pavement cracking where water ingress is undermining the pavement structure.A new roundabout will be installed. This will include kerb widening, drainage modification and pavement reconstruction. the works will significantly improve both the safety and pavement integrity at this intersection.Total cost of proposed project is $750,000
The Current road is too small and ineffective to cater for the growing city and will be reconstructed. This work is being undertaken as part of the City Centre 30 year Master Plan Upgrade. The proposed upgrade will improve the city centre traffic management and enhance business and economic development city wide.The road is being upgraded. Including full reconstruction, realignment, widening, removal of a roundabout, indented parking and pedestrian pathways.Total cost of proposed project is $4,800,000
Pavement Failure, loss in shape, localised kerb failureReconstruction of Pavement, minor kerb and channel reconstruction
Deteriorated bridge componentsBridge refurbishment
Deteriorated bridge componentsBridge replacement with concrete pipes
Deteriorated bridge componentsBridge replacement with concrete pipes
Deteriorated bridge componentsBridge replacement with concrete pipes