Existing timber bridge is in poor condition and does not meet current standards.Replacement of bridge with concrete crown units.Total cost of proposed project is $259,000
Increased traffic flows have resulted in excessive wear on the road, with potholes and corrugations requiring regular maintenanceConstruct and apply two coat sealTotal cost of proposed project is $167,052
The existing bridge has been assessed as being in a poor condition and recommended for replacement.To construct a new pre-cast three span concrete bridge 29 metres long and 4.86metres wide, fitted to existing concrete abutments. New guard rail to be fitted upon installation.
Increased traffic flows have resulting in excessive wear on the road, requiring continual ongoing maintenance.Construct and apply two coat sealTotal cost of proposed project is $53,728
Increased traffic flows have resulted in excessive wear on the road, requiring continual ongoing maintenance.Construct and apply two coat seal.Total cost of proposed project is $83,933
The existing bridge has been assessed as being in a poor condition and recommended for replacement.To construct a new pre-cast span bridge 40.45 metres long and 4.14 metres wide. The existing wooden structured bridge will be demolished and a temporary bypass will be put in place while the new bridge is being constructed.
Lindsay Point Road has been rated against Councils Road Asset Management plan and it has reached its design life. Resealing this road now will extend the life of the asset as well as providing a safe smooth road surface, free of defects.The proposed work will include road shoulder alignment and re-sealing.
Increased traffic flows have resulted in excessive wear on the road, requiring continual ongoing maintenanceConstruct and apply two coat sealTotal cost of proposed project is $28,080
Tarcoola Street has been rated against Councils Road Asset Management plan and it has reached its design life. Resealing this road now will extend the life of the asset as well as providing a safe smooth road surface, free of defects.The proposed work will include road shoulder alignment and re-sealing.
Substandard road alignment and the presence of trees adjacent to the road carriageway.Realignment of road, including land acquisition, relocation of services, fencing and tree removal before construction and sealing in 2016/17