road has poor alignment, drainage issues and corrugated,Installation of drainage pipes, base formation, and sealing 2500km to a width of 7m
Failure of the road pavement due to age and increasing traffic due to nearby development.Reconstruction of existing road including kerb and channel, widening and turning lanes.Total cost of proposed project is $1,254,748
This project will rectify existing structural road defects. These defects include significant structural and environmental cracking, high Roughness, and rutting. The project will also rectify the existing kerb and gutter in poor condition.The work involves a deeplift asphalt treatment up to a depth of 125mm. The existing road will be milled up to a depth of 125mm and replaced with asphalt. The kerb and gutter is also being replaced.
This project will rectify existing structural road defects. These defects include significant structural and environmental cracking, high Roughness, and rutting. The project will also rectify the existing kerb and gutter in poor condition.The work involves a deeplift asphalt treatment up to a depth of 200mm. The existing road will be milled up to a depth of 200mm and replaced with asphalt. The kerb and gutter is also being replaced.
Pavement is in poor condition due to age and increasing traffic volume, particularly heavy vehicles as this forms part of an over-dimensional route.Reconstruction of road pavement and installation of kerb and drainage.Total cost of proposed project is $296,000
This project will rectify existing structural road defects. These defects include significant structural and environmental cracking, high Roughness, and rutting. The project will also rectify the existing kerb and gutter in poor condition.The work involves a deeplift asphalt treatment up to a depth of 125mm. The existing road will be milled up to a depth of 125mm and replaced with asphalt. The kerb and gutter is also being replaced.Total cost of proposed project is $732,862
Road pavement has deformed and failed due to increasing traffic, particularly heavy vehicles.Reconstruction of road pavement and installation of kerb and channel.Total cost of proposed project is $397,000
The road pavement is being final sealed or resealed as per Council maintenance protocols.The entire section of pavement will be spray sealed and appropriate sized stone applied. In some instances emulsions or micro seals may be applied.
Existing bridge is in poor condition with a two tonne load limit which is inappropriate in a rural area.Replace bridge with concrete box culverts.