The pavement is heavily oxidised and displays cracking and other types of failure.Reconstruction of existing pavement with some kerb and gutter repair.
Oxidised cracking pavement surfaceCrack sealing, re-water proofing and new bitumen surface
Oxidised cracking pavement surfaceCrack sealing, re-water proofing and new bitumen surface
The pavement is heavily oxidised and displays extensive crocodile cracking, heaving and shoving. Numerous pot holes in the pavement have been extensively patched. Some areas of the kerb and gutter are also extensively cracked and overturning. The crocodile cracking is an indication that the pavement is deflecting excessively. The cracked pavement and kerb and gutter will allow excessive moisture to enter the pavement and promote premature failure.Reconstruction of existing pavement with some kerb and gutter repair.
The pavement is heavily oxidised and displays cracking and other types of failure.Reconstruction of existing pavement.
Oxidised cracking pavement surfaceCrack sealing, re-water proofing and new bitumen surface
Oxidised cracking pavement surfaceCrack sealing, re-water proofing and new bitumen surface
Oxidised cracking pavement surfaceCrack sealing, re-water proofing and new bitumen surface
Oxidised cracking pavement surface and damage due to high volumes of heavy vehiclesImprove structural integrity of pavement and skid resistanceTotal cost of proposed project is $72,977
The pavement is heavily oxidised and displays cracking and other types of failure.Reconstruction of existing pavement including kerb and gutter repair.