• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2015 - Apr 2016
  • Estimated project cost $341,822
  • Australian Government contribution $339,859
  • Local Council/Shire Shire of Donnybrook Balingup
  • State WA

Project description

Insufficient drainage infrastructure in order to cater for existing and expanding residential area. This section of Bridge street consistently raises drainage issues in regards to driveway erosion, residential water damage, road surface and edge deterioration. Surface water runoff causes significant damage every winter.

Construct stormwater drainage consisting of concrete pipes and pits. Reconstruct and improve road vertical geometry, reconstruct road pavement layer and surface. Install kerbing. Survey and design completed.

Total cost of proposed project is $341,822

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.