• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2017 - Mar 2017
  • Estimated project cost $149,634
  • Australian Government contribution $120,000
  • State NSW

Project description

The existing surface is affected by numerous cracks. It is old, brittle and prone to development of potholes. Road roughness is high.

The proposed work will include strengthening of road base with asphalt and resurfacing of the road with asphalt. Length = 240 m; Width = 8.2 m; Area = 1968 m2.

Total cost of proposed project is $149,634

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.