• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2023 - Sep 2023
  • Estimated project cost $73,650
  • Australian Government contribution $73,650
  • Local Council/Shire District Council of Robe,Latrobe Council,Latrobe City Council
  • State SA

Project description

This is to sufficiently create a connection between water bodies and to rectify a loss of flood storage capacity. This loss has not been accounted for in all flood and high tide storm modelling and the absence of an adequate connection presents a risk to road and other infrastructure

1. Box Culverts to suite equivalent DN600 RC Pipe. 2. Installation of Box Culverts from one side of the road to the other. 3. Backfill with imported sand and install road base to surface level. Asphalt cut with road base trimmed. 4. Asphalt reinstatement allowed for is 40mm thick AC10 hot mix

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.