Bitumen surface is showing signs of distressReseal to extend life by a further 10 years or so
Bitumen surface is showing signs of distressReseal to extend life by a further 10 years or so.
Road was originally constructed in 1970 and was resheeted with a 40mm overlay in 1998. This section of Hughes Parade is a strategic freight route within the municipality and is the only viable access road between industrial properties in Reservoir and the Metropolitan Ring Road (M80). Over time and with higher than anticipated heavy vehicle use the condition has significantly deteriorated and the road is now in need of reconstruction. Road is experiencing extensive rutting and crocodile cracking from greater than design levels of crocodile cracking.Reconstruction of the road pavement (details subject to pavement testing).Total cost of proposed project is $146,128
Bitumen surface is showing signs of distressReseal to extend life by a further 10 years or so
Bitumen surface is showing signs of distressReseal to extend life by a further 10 years or so
Seal is showing signs of distressPrepare the pavement with some heavy patches, then reseal to extend the life by 10 years or so
Bridge barrier end terminals are not compliant for crash worthiness.Upgrade of Bridge barrier end treatments to Main Roads standardsTotal cost of proposed project is $39,933
Narrow Seal, edge breaksWiden existing pavement & seal extension to meet route extension
Alignment and pavements upgradeFull reconstruction and pavements upgrade
Narrow seal, edge breaksWiden existing pavement and seal extension to meet route extension