Sections of the rubble surface have worn out leaving the road surface uneven and rough.To re-sheet 3 kilometres of road with Limestone Rubble to provide a hard trafficable and safe road.Total cost of proposed project is $117,479
Extreme crocodile cracking / large potholes / depressions and edge breaks failed sealStabilise failed seal and pavement. Stabilise 200mm depth @ 2% cement with a two coat 10/7 spray seal treatment
Extreme crocodile cracking / potholes / road depressions and edgebreaksStabilise failed seal and pavment. Stabilise 200mm depth @ 2% cement with a two coat 10/7 spray seal treatment
Extreme crocodile cracking / large potholes / depressions and edge breaks failed sealStabilise failed seal and pavement. Stabilise 200mm depth @ 2% cement with a two coat 10/7 spray seal treatment
Extreme crocodile cracking / large potholes / depressions and bleeding sealMill and fill 60mm depth supply and lay 14H Asphalt @ 80mm
Extreme crocodile cracking / large potholes / depressionsMill and fill 60mm depth supply and lay 14H Asphalt @ 80mm
Extreme crocodile cracking / large potholes / depressions and edge breaks failed sealStabilise failed seal and pavement. Stabilise 200mm depth @ 2% cement with a two coat 10/7 spray seal treatment
Bitumen surface is showing signs of distressReseal to extend the life by a further 10 years or so.
Bitumen surface is showing signs of distressReseal to extend life by a further 10 years or so.
Bitumen surface is showing signs of distressReseal to extend life by a further 10 years or so