Gravel thickness not sufficientSupply, cart, grade and compact with gravel resheet of 100mm depth of road making gravel
Gravel thickness not sufficientSupply, cart, grade and compact with gravel resheet of 100mm depth of road making gravel.Total cost of proposed project is $13,933
The gravel road travelling surface has worn away.Road to be resheeted with gravel to restore driveability.
The gravel road travelling surface has worn away.Road to be resheeted with gravel to restore driveability.
The gravel road travelling surface has worn away.Road to be resheeted with gravel to restore driveability.
The gravel road travelling surface has worn away.Road to be resheeted with gravel to restore driveability.
Narrow formation width of 6.0m, virtually no gravel remaining in section, no longer a function all-weather road, but is required to be. The route is used by harvest traffic which includes heavy vehiclesWiden formation to 8.0m, rip and reshape road and overlay with gravel pavement of 0.10m thick. 1.0km of gravel re-sheeting within the zone.
Damage to road after large rain event. The road surface was eroded and much of the gravel washed off. This also affected some of the drainage areas.Clear drainage areas and re-sheet with gravel.
Narrow formation width of 6.0m, virtually no gravel remaining in section, no longer a function all-weather road, but is required to be. The route is used by harvest traffic which includes heavy vehiclesWiden formation to 8.0m, rip and reshape road and overlay with gravel pavement of 0.10m thick. 2.0km of gravel re-sheeting within the zone.
Narrow formation width of 6.0m, virtually no gravel remaining in section, no longer a function all-weather road, but is required to be. The route is used by harvest traffic which includes heavy vehiclesWiden formation to 8.0m, rip and reshape road and overlay with gravel pavement of 0.10m thick. 0.70km of gravel re-sheeting within the zone.