Existing pavement has worn and needs replacement crushed rockResheeting with crushed rock (Length 4610 Width 4m Depth 100mm)
Existing pavement has worn and needs replacement crushed rockResheeting with crushed rock (Length 2360 Width 4m Depth 100mm)
Existing bitumen seal on the pavement is aged and/or cracking,Work will be carried out to resurface the pavement with a new layer of bitumen and wearing aggregate (stone) (1650m x 6.2m)
This section of McEwen Road is a boundary road with the Greater Shepparton City Council and will attract their funding for 50% of the works.Total cost of proposed project is $278,248
Existing pavement has worn and needs replacement crushed rockResheeting with crushed rock (Length 2600 Width 4m Depth 100mm)
pavement is damaged, seal is worn, surface drainage is poor, kerbing is damaged,extensive pre-seal repairs including patching, pavement repairs, replace damaged kerbing, followed by re-seal
The gravel pavement has worn away making the road slippery when wet. The length of the road is 1043 metre and 6 metres wide.Gravel resealing is proposed to rectify the problem.Total cost of proposed project is $48,600
Excessive cracking and pavement failureMill 40mm deep, and pave 40 mm AC10 Class 450, plus heavy patching as required
Excessive cracking and pavement failuresMill 40mm deep, and pave 40 mm AC10 Class 450, plus heavy patching as required
Excessive roughness and ravellingMill 50mm and Pave 50 mm AC 14 Class 450, plus heavy patching where required
The gravel pavement has worn away making the road slippery when wet. The length of road is 3500 metres and 6 metres wide.Gravel reseal is proposed to rectify the problem.Total cost of proposed project is $80,200