Install full time, fully controlled right turn on the south approach at signalised intersection.
New splitter islands, road widening and bellmouth sealing. ??Lighting upgrades at intersections. Existing ?one-lane bridge to give priority to southbound motorists, with supporting signage and line marking.
Install multiple speed cushions at roundabout. Install bike sharrows, signage, and street lighting upgrades.
This section of Playfoot Street is an unsealed road, making dust a major problem for nearby residences.Gravel paving and two coat bitumen seal, 8m wide x 200m long with construction of new kerb and channel.
Shoulder widening through curves, safety barrier installation, improved delineation and signage. Undertake speed limit review.
Install safety barrier and multiple safety terminals with rub-rail at high-risk sites. Install advisory speed signage and curve alignment markers.
Install side road activated speed signs, raised safety platforms on Poplar Avenue. ?Install mountable concrete apron to reduce the lane width and channelise vehicles change from Give Way to Stop control.
Installation of a raised intersection and hazard boards to reduce the see through effects. Lighting and drainage upgrades.
Install raised safety platforms on all legs of the roundabout including wombat crossings on the western leg and eastern leg of High St (Pyrenees Hwy).