Widen the road and install a painted separator between the through lane and left turn lane. Reconstruct the intersection pavement and install safety barrier to shield power poles.
Installation of raised safety platforms, drainage and street lighting upgrades, improved delineation and line marking.
Install a raised intersection, signage and associated line-markings with improved delineation.
Install raised safety platforms, pedestrian refuge islands and additional warning signs, and link footpaths. Modify existing roundabout to improve deflection. Consider speed limit reduction to 60 km/h between Dundas St and French St.
Fully controlled right hand turn treatment is proposed for all legs and associated other works.
Install single lane roundabout, including pedestrian and cycling facilities.
Aged seal at wide river crossing is in poor conditionRepair edges and apply re-sealTotal cost of proposed project is $715,507
Construct as a raised intersection with wombat crossings and improved street lighting. Signage duplication and delineation improvements.
Construct roundabout with splitter islands and raised safety platforms. Undertake speed zone reduction review.
Install area wide 40 km/h speed with associated signs and 40 km/h pavement markings. Speed reduction traffic management treatments throughout the local area to support existing treatments.