Renewal of gravel pavement on high volume local roads providing access for agriculture, logging and quarry trucksAddition of gravel material to road pavement to make safe for users
Loss of shape, gravel and potholes along these sections. These sections vary in size from 100mts to 250mts.Areas to be re-sheeted with 150mm of sandstone to restore shape of road
Road safety improvements for road users on sites with poor road alignment.Replacement of damaged and non standard guardrails, installation of new guardrails
Road safety improvements for road users on sites with poor road alignment.Replacement of damaged and non standard guardrails, installation of new guardrails
Remove and replace existing culverts as the existing ones are failing and creating flooding issues.Supply and install 100m of 600m x 300m box culverts and bases and install them to fix the current local flooding problem.
Poor pavement. Block cracking present throughoutReconstruction of damaged sections of kerb & gutter to improve drainage. Profile 40mm depth and resurface/ reseal the road with 10mm type hot mix asphalt with binder and 30% reclaimed asphalt pavement.
Poor pavement. Longitudinal cracking & preservation - cracking coming throughReconstruction of damaged sections of kerb & gutter to improve drainage. Profile 40mm depth and resurface/ reseal the road with 10mm type hot mix asphalt with binder and 30% reclaimed asphalt pavement.Total cost of proposed project is $42,028
The project grade separated the intersection at Sand Road on the Princes Freeway East. The project constructed a new bridge overpass for Sand Road, four new entry and exit ramps, two new roundabouts, rehabilitated existing carriageways and local access roads, and installed new signage, street lighting and bicycle facilities.
Excess speeds used by drivers and safety concerns of residentsInstallation of 3 mini roundabouts and one chicane. Roundabout installation at the following intersections with Harpenden Street: Dalyup Road, Thomasia Street and Bonney Street and the chicane adjacent to Jarbell WayTotal cost of proposed project is $502,806
Poor condition of the road surface due to age, traffic wear and water infitration damageResurfacing of the road - mill and replace asphaltTotal cost of proposed project is $102,586