Road pavement failure, cracking, potholes, surface deteriorationRoad pavement reconstruction and ResurfacingTotal cost of proposed project is $556,000
The existing seal is passed its expected life duration which is creating cracks and potholes.Reseal over the existing seal with a rubber seal to extend the life of the seal.
Old asphalt seal is showing signs of distress (ie. longitudinal cracking, rutting and potholing). Length of works 380 metresProfile existing failing asphalt surface and replace with new 30 millimetre thick size 10 millimetre aggregate Type N asphalt seal
Rutting, loss of shape and potholesResheet road with recycled crushed concrete at 100mmTotal cost of proposed project is $21,211
Road construction and primerseal undertaken in 22/23 financial year requires a Final SealApplication of Final seal
Existing seal has cracking, oxidisation and loss of aggregateUndertake reseal
The project provided a new left turn lane at Terang-Mortlake Road and a new right turn lane at Old Peterborough Road.
Renewal of gravel pavement on high volume local roads providing access for agriculture, logging and quarry trucksAddition of gravel material to road pavement to make safe for users
Renewal of gravel pavement on high volume local roads providing access for agriculture, logging and quarry trucksAddition of gravel material to road pavement to make safe for users
Renewal of gravel pavement on high volume local roads providing access for agriculture and quarry trucksAddition of gravel material to road pavement to make safe for users