Poor aesthetics with poor drainageInstall Kerb and Channel with drainage
Existing timber bridge is no longer structurally soundRefurbishment/replacement of existing 12m timber bridgeTotal cost of proposed project is $363,571
Existing timber bridge is no longer structurally sound and has a load limit of 10 tonnes which is inadequate for the current trafficRefurbishment of existing 8m timber bridge
Worn out pavement at the end of its useful life. Unsafe bends due to narrow seal.Reconstruct pavement and widen seal
Road suffers from severe corrugation and pot holing due to minimal and unsuitable material on roadResheet 3500 metre X 6 metre wide section of road with 150mm compacted rubbleTotal cost of proposed project is $138,994
Existing surface is rough and badly potholed increasing road maintenance costs and decreasing road safety. Road surface has reached the end of its life.Resheet existing road surface with 100mm of gravel for 7m wide for 3.56 kilometres long.Total cost of proposed project is $220,860
Road suffers from severe corrugation and pot holing due to minimal and unsuitable material on roadResheet 1.5kms x 6 metres of road with 150mm compacted rubbleTotal cost of proposed project is $61,796
Existing surface is extremely rough and corrugated increasing road maintenance costs and decreasing road safety. Road has reached the end of its life.Resheet existing road surface with 100mm of gravel for 8m wide for 5.04 kilometres long.Total cost of proposed project is $383,730
Road suffers from severe corrugation and pot holing due to minimal and unsuitable material on roadResheet 3500 x 6 metre wide section of road with 150mm compacted rubbleTotal cost of proposed project is $137,193
Road has deteriorated with pitting and loss of shape due to natural wear and tear.150 millimetre Gravel Re-sheet, 4 percent cross-fall with centre crown reinstatement and associate table drain reconditioningTotal cost of proposed project is $129,389