Recent roadworks require 2nd coat bitumen seal to complete the project.2nd coat bitumen seal to 2014/15 roadworks
Pavement failure resulting in severe depressions and unsafe driving conditionsRip the existing road, add new material, reform and seal to the existing 6.2m seal widthTotal cost of proposed project is $97,000
Pavement failure causing roughness and premature failure of the seal surfaceRip the existing road add new material reform compact and widen the seal to 7.2 metres to meet freight route standardsTotal cost of proposed project is $323,000
Road cracked and potholed, rusted/unstable road drainage.30mm/10mm asphalt overlay, replace road drainage (21), kerb and driveway fronts 30mm/10mm asphalt.Total cost of proposed project is $366,797
This portion of Scotts Brook Road is a narrow sealed road (5.2 metres wide)with little or no shoulders. This project will see the forming up of 1.2 metre shoulders each side of the road and the sealing a 300mm wide strip each side of the road.Increasing the pavement formation width to 9.0 metres and increasing the sealed pavement to 6.0 metres wide
Road cracked and potholed, rusted/unstable drainage.30mm/10mm Asphalt overlay, replace road drainage (5) and kerbing (390m)Total cost of proposed project is $121,725
Road cracked and potholed and crushed/missing kerbing.30mm/10mm Asphalt overlay and kerbing (220m)Total cost of proposed project is $89,117
Road cracked and potholed,rusted/unstable road drainage and crushed/missing kerbing30mm/10mm Asphalt overlay,replace road drainage (9)and kerbing (700m)Total cost of proposed project is $153,141
Road cracked and potholed, rusted/unstable road drainage and crushed/missing kerbing30mm/10mm Asphalt overlay, replace road drainage (10)and kerbing (700m)Total cost of proposed project is $292,225