This portion of railway Parade was reconstructed in 2013-2014 and sealed with a primer seal. It now requires the 2nd coat 10mm stone bitumen seal.Second Coat (reseal) bitumen seal to primer coat
Guardrail at bridge in poor condition, timber posts rotten causing guardrail to be loosereplace guardrail and posts with new
road pavement in poor condition, kerbing damaged in many placesrehabilitate the road surface and apply new seal, replace kerbing for length 160 metres both sides (i.e. total 320 metres)
The surface is rough and eroded due to traffic and weather.It is planned to add gravel and regrade the surface.
The surface is rough and eroded due to traffic and weather.it is planned to add gravel and regrade the surface.
The surface is rough and eroded due to traffic and weather.It is planned to add gravel and regrade the surface.
The surface is rough and eroded due to traffic and weather.It is planned to add gravel and regrade the surface.
The surface is rough and eroded due to traffic and weather.It is planned to add gravel and regrade the surface.
The surface is rough and eroded due to traffic and weather.It is planned to add gravel and regrade the surface.
The existing causeway is old and sections of concrete have failed. The length of the causeway is 9 metres and the width is 3.8 metres.It is proposed to renew the causeway.