The western end of Railway has significant pavement failures both in the subgrade and the sealed surface. Road drainage is poor and pavement width is too narrow to safely accommodate 2 lanes of traffic and parked cars.Reconstruct formation, upgrade drainage by the addition of new kerbing and then 2 coat bitumen seal
Road cracked and potholed and crushed/missing kerbing30mm/10mm Asphalt overlay)and kerbing (570m)Total cost of proposed project is $225,902
Badly potholed and mostly sandRoad requires 2 coat seal 10mm & 7mmTotal cost of proposed project is $103,123
Multiple cracks and tree root damaged.Road requires 7mm chip sealTotal cost of proposed project is $159,636
Edge patching deterioration, badly potholed with major edge breaksRoad requires 7mm chip sealTotal cost of proposed project is $205,689
Badly potholed and strippedRoad requires 7mm chip sealTotal cost of proposed project is $183,000
Badly potholed and strippedRoad requires 7mm chip sealTotal cost of proposed project is $28,737
Badly potholed and strippedRoad requires 7mm chip sealTotal cost of proposed project is $104,771
Badly potholed and strippedRoad requires 7mm chip sealTotal cost of proposed project is $146,210
Badly potholed and strippedRoad requires 7mm chip sealTotal cost of proposed project is $105,587