Wattle Avenue is a local urban street, serving adjacent residential properties. Wattle Avenue was constructed in 1974 and is nearly at the end of its useful service life. The road pavement is in need of reconstruction. New road surfacing is required and kerb & channel and footpaths need to be replaced. New stormwater infrastructure will also be included to this work.Excavation and replacement of the road pavement, installation of new stormwater infrastructure and new sealed surfacing. Replace kerb & channel, footpaths and driveways in the area of works.Total cost of proposed project is $612,629
Pekurn Crescent is a local urban street, serving adjacent residential properties. Pekurn Crescent was constructed in 1957 and is nearly at the end of its useful service life. The road pavement is in need of reconstruction. New road surfacing is required and kerb & channel and footpaths need to be replaced. Renewal of stormwater infrastructure will also be included to this work.Excavation and replacement of the road pavement, replacment of new stormwater infrastructure and new sealed surfacing. Replace kerb & channel, footpaths and driveways in the area of works.Total cost of proposed project is $335,696
Gepp Parade is a local urban street, serving adjacent residential properties. Gepp Parade was constructed in 1947 and is nearly at the end of its useful service life. The road pavement is in need of reconstruction. New road surfacing is required and kerb & channel and footpaths need to be replaced. Upgrading stormwater infrastructure will also be included to this work.Excavation and replacement of the road pavement, upgrading stormwater infrastructure and new sealed surfacing. Replace kerb & channel, footpaths and driveways in the area of works.Total cost of proposed project is $769,166
The bitumen seal is showing signs of distress because of its age and requires a reseal. The length of the road is 1100 metres and the width is 5.5 metres.It is proposed to apply a bitumen reseal.
The gravel pavement has worn away making the road slippery when wet. The length of the road is 3500 metres and the width is 6 metres.Gravel resheeting is proposed to rectify the problem.
Worn out asphalt surface (cracked and ravelled), cracked kerbing and damaged pram ramps, crossovers and drainage grates along with minor traffic management issues.Partial New Kerbing, Traffic Treatments, Drainage Grate adjustments and Asphalt Overlay. Length 300 metres x Width 7 metres
The existing causeway is old and sections of concrete have failed. The length of the causeway is 29 metres and the width is 3.4 metres.It is proposed to renew the causeway.
Defective pavement resulting in uneven driving surface, premature seal failure and decreased driver safetyRehabilitation of existing sealed road pavement to improve ride-ability, driver safety and pavement longevity
The road has insufficient width, the pavement is breaking up and rutting. The length of the road is 1100 metres and the width is 7 metres.Road reconstruction and widening.
Defective pavement resulting in uneven driving surface, premature seal failure and decreased driver safetyRehabilitation of existing sealed road pavement to improve ride-ability, driver safety and pavement longevityTotal cost of proposed project is $581,907