Road surface has worn out and the vegetation is overgrown which has narrowed the roadway.Trim back vegetation and re-sheet the road.
Road is subject to a large number of vehicles transporting sealing aggregates. Road has deteriorated and is rutted and corrugated.Supply, spread and compact 150-200mm of gravel over 1.5 km of road. Prepare and seal constructed road formation.
Road surface has worn out and vegetation has overgrown which has narrowed the roadway.Trim back vegetation according to Vegetation Management Plan and re-sheet the road.Total cost of proposed project is $120,000
Road surface has worn out and vegetation has overgrown which has narrowed the road.Trim back vegetation according to Vegetation Management Plan and re-sheet the road.
Section of road is deteriorated and needs sealing.Widen formation, expand culverts, add base and new seal
Road surface has worn out.Re-sheet this section of roadTotal cost of proposed project is $67,500
Worn, deformed pavement, with inefficient pavement width.Install underground drainage. Install concrete kerb and gutter. Rip and reshape existing pavement, add 150mm of DGS20 road base, shape, compact, trim and two coat C170 bitumen seal.
Asset Renewal- Expired Asset, Road has poor drainage and road surface is lacking in materialResheet this 3.2km segment of unsealed road by applying a 100mm thick sheet of crushed limestone rubble and compact. Renew road surface drainage.
Road surface has worn out.Re-sheet this section of road.Total cost of proposed project is $37,500
Worn, deformed pavement, with inefficient pavement width.Install concrete kerb and gutter. Rip and reshape existing pavement, import 150mm of DGS20 road base, shape, compact, trim and two coat C170 bitumen seal.