Existing sealed street has deteriorated and kerb and gutter is deformed.Remove existing road and kerb and gutter. Construct new kerb and gutter, road pavement and apply a 2 coat bitumen seal.
Existing sealed street has deteriorated and kerb and gutter is deformedRemove existing road and kerb and gutter. Construct new kerb and gutter, road pavement and apply a 2 coat bitumen seal.
Existing road is badly deformed with poor drainage.reconstruct and stabilise road on the existing formation and level, apply a 2 coat bitumen seal.Total cost of proposed project is $114,300
The existing road pavement is very sandy and quickly corrugates and forms windrows under trafficApply a 150mm compacted thickness gravel re-sheet on the existing road formation
Currently the crossing is positioned at a bench which is causing issues for motorists to pass oncoming traffic, including a build up of silt at the crossing after rain.Install 3-3600 x 3600 Slab Link Box Culverts with approachesTotal cost of proposed project is $438,396
Pavement failure due to the road being deformed and crackingPavement rehabilitation, reprofiling and 18.5m wide DG10 Asphalt 40mm overlayTotal cost of proposed project is $350,000
Kerb and channelling is deteriorating and no bitumen exists between road edge and kerbPavement rehabilitation, widen to 10m, stormwater drainage, kerb and channel and bitumen sealTotal cost of proposed project is $220,000
Kerb and channelling has deteriorated due to constant use by heavy vehicles, including water pooling from rain due to lack of drainage in the areaRemove existing kerb and channel and install Capricorn Municipal Development Guidelines compliant kerb and channel and industrial accesses
Road surface has deteriorated including sub soil drainage failureReprofile pavement and regrade kerb & channel
Road surface in a poor condition with extensive cracking and raveling. Kerb and Channel in poor condition with broken and missing sectionsUndertake a general road refurbishment including pavement repairs, road resurfacing and kerb replacementTotal cost of proposed project is $459,328