Cracking & weathered sealed surfaceBitumen Reseal (960 metres x 7.5 metres)
Existing bitumen road surface is inadequate and deteriorating with large mining truck movementsReseal intersection with mine entrance (100 metres) with asphalt to eliminated damage to road surface
Drainage issues due to pitting and cracking in surfaceBitumen reseal (640 metres x 11 metres)
cracking and holes in current sealBitumen reseal (495 metres x 10 metres)
Cracking and holes in current sealBitumen reseal (480 metres x 8.5 metres)
Loss of pavement material causing uneven surface with poor strength and rideability.Import crushed rubble, spread, trim and compact. Renew signage and delineators.
Loss of pavement material causing uneven surface with poor strength and rideability.Import crushed rubble, spread, shape and compact. Renew signage and delineators
Road safety is a major concern. This is a heavily trafficed rural road. As a result of seasonal harvest traffic, this road has suffered from major deterioration.Works will include full road rehabilitation approximately 6m wide, 150mm gravel overlay over the entire length and a two coat seal from chainage 1.36km to 2.61km.
Road safety is a major concern. This road is a local school bus route and is narrow and sub standard road geometry.Works will include a 100mm overlay, 6m wide and 2 coat seal.
Loss of pavement material causing pavement failure and poor shapeImport crushed rubble, spread, shape and compact. Renew signage and delineators