Unsealed shoulders are very rough on both sides of the road and in dire need of additional pavement materialTo add 100 millimetres layer of new gravel material and re-grade to improve current standard of road shoulder. Proposed length of work is an approximate distance of 1.2 kilometres
Unsealed road is very rough and in need of additional pavement materialTo add 150 millimetres layer of new gravel material and re-grade to improve current standard. Proposed length of work is 50 metres from CH0370 to CH0420 and 100 metres from CH2400 to CH2500. Proposed length of work is an approximate distance of 150 metres on both sides of the road
Failed pavementIntersection rehabilitation and associated kerb infrastructure
Road has tight bends and poor horizontal and vertical sight lines with large trees close to the shoulders. It currently has a gravel surface and deteriorating pavement.Widen and straighten road, improve drainage, renew pavement and seal for a total distance of 2.0km
Drainage and flooding issues due to no lack of kerb and drainage infrastructure.Reconstruct 200m of kerb and pavement and install drainage pits.
Existing floodways are inadequate to cater the cross drainage and also in poor condition. This creates increased maintenance costs and very poor traffic conditions.To reconstruct existing concrete floodways to required size to cater drainage demand.
Road pavement easily becomes degraded due being unsealed and having high traffic volume.Earthworks to widen pavement and improve drainage 24km from Brand Highway to Munbinea Road.
The pavement contains poor material and the surface is old and unevenDeep lift stabilise 200mm of the road pavement and reseal the road
The pavement contains poor material and the surface is old and unevenDeep lift stabilise 200mm of the road pavement and reseal the road
The pavement contains poor material and the surface is old and unevenDeep lift stabilise 200mm of the road pavement and reseal the road