Severe pavement deterioration causing safety issues.Recycle existing pavement with lime stabilisation and new 2 coat chip seal.
Insufficient drainage causing safety issues to pedestrians and road users.Kerb and channel, footpath, pavement repairs and signage.
Pedestrian risk has been identified by traffic turning west from Best Street into the Esplanade.
Pedestrians do not have enough time to safely cross the westbound lane.Moving the crossing point for pedestrians to the "desire" line i.e the path pedestrians currently take and using the existing splitter islands as refuge points.Total cost of proposed project is $21,926
Insufficient drainage causing safety issues to pedestrians and road users.Drainage, kerb and channel and pavement overlay.
the road surface is cracked and revelled due to age and traffic loading and offers little protection for the underlying road pavementthe resealing 550m x 8m in width
the road surface is cracking and ravelled due to age and traffic loading and offers little protection for the underlying road pavementthe resealing of 589 x 9.6m in width
The seal has deteriorated due to wear and tear over time.It is proposed to reseal the 600m length of Acacia Drive between Redbank Drive and Melaleuca Court at the existing width.
The seal has deteriorated due to wear and tear over time.It is proposed to reseal the 630m length section from Gregory Developmental Road to the end at the existing width.
Council staff have identified safety issues and high maintenance costs due to regular traffic movements and the increase in visitor/tourists in a variety of different vehicles (RV's, Caravans, Buses). the length of the road is 9.1 kilometres. Several sections including corners, crests and hair-pin corners have been identified for reconstruction, rehabilitation, realignment, storm-water drainage and widening.Road widening, corner realignment, table drains and culvert construction, re-sheeting, grading sections of road two coat bitumen seal and road signage and guide posts.
There is a very steep drop off from the southern side of Old Narrandera Road on the west bound climb over Malebo Hill. The likelihood of a driver running wide on the curve ,running off the seal and losing control is high.Installation of a wire rope barrier treatment for 300 metres.Total cost of proposed project is $26,063