Ageing seal to be rejuvenated to extend life expectancy of assetHot Bitumen and aggregate seal
Ageing seal to be rejuvenated to extend life expectancy of assetHot Bitumen and aggregate seal
Ageing seal to be rejuvenated to extend life expectancy of assetHot Bitumen and aggregate seal
Ageing seal to be rejuvenated to extend life expectancy of assetHot Bitumen and aggregate seal
The current subdivided industrial blocks have no proper access or services to enable industry to establish in Napranum. The blocks are situated on an old Community farm.Provide subdivision access to full industrial bitumen standard including stormwater, sewerage , electrical and communications services.Total cost of proposed project is $2,359,261
bad rutting and loss of gravelresheet the road for length of 1.5km and width of 8 metres
Improve road safety by widening the road for road trains and providing a separate bicycle path to protect cyclist against road trainsTo widen Ilparpa road from 6m wide to 8m wide, improve stormwater drainage and provide a new 2.5m wide bicycle pathTotal cost of proposed project is $3,147,747
rough ride, loss of gravelresheet the road for length of 1.0km and width of 4 metres
This road services primary and mine industries including some heavy vehicles. The existing seal surface and subgrade has deteriorated and requires stabilisation in places. It is also very narrow in some sections and requires shoulder reinstatement.Supply and spread of new road base material. Stabilisation to a depth of 280mm and two coat bitumen seal. Shoulder reinstatement and widening in sections. Construction of 3 slip lanes. Culvert concrete overlays.
Wash outs and loss of stabilization following rain events.Cement stabilizations to flood ways.