Wash outs and loss of stabilization following rain.Cement stabilization to flood ways.
Deteriorated pavement due to high traffic counts.Re-formation and Re-sheeting.Total cost of proposed project is $593,392
Deteriorated pavement due to high traffic counts.Re-formations and re-sheeting.Total cost of proposed project is $590,219
The area adjacent to Shanks Road lacks adequate drainage which results in flooding of the area in storm events.As open shallow drain from the impacted area to a main drain, approximately 150-200m north, is proposed at this stage.
loss of gravel causing rutting in the roadresheet the road for width of 8 metres and length of 1300 metres starting
The grid needs replacing as the foundation of the grid has cracked and the railing of the grids has broken awayGrid replacement
Road seal and pavement failing and maintenance costs risingPlane and reinstate sections of failed pavement,apply an asphalt overlay and linemark.
Road seal and pavement are failing and maintenance costs are risingPlane and reinstate failed pavement areas, apply an asphalt overlay and linemark
Road seal and pavement are failing and maintenance costs are risingPlane and reinstate failed pavement areas and apply an asphalt overlay in areas as required and linemark
Road seal and road pavement are failing and maintenance costs are risingPlane and reinstate failed pavement areas, apply asphalt overlay and linemark