Existing road is very deteriorated, it is Councils top priority within the township. The road has extensive pothole patching that has lead to a very rough surface.Rehabilitate the existing pavement and seal. Drainage upgrades will also occur due to poor drainage adding to the pavement defects. Draiange upgrades will include new kurb and gutter and drain cleaning. Works will begin at 0.000 km and will end at 0.500 Km from the Thunderbolts Way.
Deterioration of Emu Creek Road, due to soft underlying pavement.Heavy Patch the small segment to improve the ride quality. Roadworks will begin 5.630 Km from Thunderbolts Way and will end 5.670 Km from Thunderbolts Way.
Existing concrete pavement with extensive cracking and joint displacement.Replace deteriorated concrete road pavement with flexible asphalt pavement.
Significant pavement failure and is in need of renewal. Require drainage upgrade including provision of kerb and gutter.Proposed works will replace the upper granular section of the base course with flexible pavement. Road pavement rehabilitation works for a length of 150m and width of 7.5m include mill and fill with 60mm thick asphalt base layer and 30mm wearing course. Works include provision of kerb & gutter and drainage upgrade.
The existing road is narrow (approximately 6m) , has poor pavement structure with substantial edge break, a dangerous horizontal curve and inadequate surface drainage. Garroorigang Road links the Hume Highway to Braidwood Road and has substantial heavy traffic.The works will widen the existing pavement to a 9m formation including 2 x 3.5m traffic lanes plus a 1m shoulder on each side. There will be improvements to the horizontal and vertical alignment, pavement rehabilitation and additional surface drainage.
Improve passability during wet weather as road is dirt and becomes boggy. Also to give property owners all weather access along the road.Construct road to bitumen seal standard.
road is badly corrugated and suffers from gravel lossresheet the road for length of 700 metres and width of 8 metres
Ageing seal to be rejuvenated to extend life expectancy of assetHot Bitumen and aggregate seal
Ageing seal to be rejuvenated to extend life expectancy of assetHot Bitumen and aggregate seal
Ageing seal to be rejuvenated to extend life expectancy of assetHot Bitumen and aggregate seal