Road shoulders have deteriorated through the loss of gravel and are in need of new material in order to bring it back into safe and usable conditionReshape and resheet road shoulders between chainages 6.6 to 15.5 and 17.9 to 21.6 adding new gravel where required.
Deterioration of sealed road surface, loss of stone, carcking, oxidation of seal and pavement failure including roughness and breaking up of pavement surface to a condition where intervention is requiredRepair road surface by crack sealing and asphalt patching in preparation for resealing,
Bridge has been inspected by engineers and can no longer perform as required. Deck is degrading with gaps forming where the timber members are broken and rottingDemolish existing timber bridge and replace with concrete structure
Narrow culvert is restricting the ability of the road to handle traffic in two ways at this locationRepair existing culvert and widen each side to match road width
Failing box Culvert at the intersection of McCulloch Street and Lane Street - Infrastructure over 40 years old, signs of deterioration with collapse of section of culvert in recent years involving the street sweeper causing the culvert to cave in. minor remediation works conducted. Full reconstruction recommended.It is recommended to replace the box culverts going across the length of McCulloch Street which will be completed in conjunction with the McCulloch Street reconstruction works. Precast Box Culverts will be installed to replace existing damaged infrastructure.
Severely damaged major road outside Broken Hill High School. Road links West Broken Hill to the CBD and East Broken Hill. Extensive cracking and deformation of roadIt is proposed to reconstruct the road from the subgrade with an asphalt seal. The project will be put to tender and contracted out due to timeframe to deliver. The contractor will be responsible for design and construction. Council will act as Project Manager.
Traffic congestion and safety. Whilst both roads carry considerable amount of traffic with Middle Arm Rd being also classified as a B-Double route.Construction of a new roundabout.Total cost of proposed project is $396,483
Road surface has deteriorated and allowed water to enter pavement causing potholesPartial reconstruction of affected water damaged area and application of new bitumen sealTotal cost of proposed project is $21,724
Road surface has deteriorated and allowed water to enter pavement causing potholespartial reconstruction of affected water damaged area with application of new bitumen sealTotal cost of proposed project is $21,725
Road surface has deteriorated and allowed water to enter pavement causing potholesPartial reconstruction of affected water damaged area and application of new bitumen sealTotal cost of proposed project is $21,724