Dust problems for residents and increasing maintenance costs due to gravel washing from road.Sealing of section of road.
Existing carriageway has eroded to state that base material is now exposed. This road is a school bus route in addition to residential traffic.Resheeting gravel road to improve road surface.Total cost of proposed project is $250,000
Road pavement suffers from lack of effective drainage which is compromising the road condition. This is resulting in various surface defects which can become driver safety issues.Reconstruction of kerb and channel, and drainage between 5 Fenton Crescent and Violet Street, in order to preserve the road pavement. An asphalt overlay will be completed on the road surface to improve driver safety.
Gravel road has deteriorated as a result of loss of crushed rock on road surface resulting in slippery surface and frequent potholingLay 80 mm compacted gravel to surface of road for a length of 3,300 metres and 3.8 metre width
Gravel Road has deteriorated as a result of loss of crushed rock on road surface resulting in slippery road surface and frequent potholing.Lay 80 mm crushed rock to road surface for a length of 2,700 metres and 5 metre width
Gravel road has deteriorated as a result of loss of crushed rock on road surface resulting in slippery surface and frequent potholingLay 80 mm compacted crushed rock on road surface for a length of 1,450 metres and 4.5 metre width
Gravel road has deteriorated as a result of loss of crushed rock on road surface resulting in slippery surface and frequent potholoingLay 80 mm compacted gravel to road surface for a length of 1,600 metres and a width of 5.2 metres
Gravel Road has deteriorated as a result of loss of crushed rock on road surface resulting in slippery surface and frequent potholingLay 80 mm compacted gravel to road surface for a length of 1,600 metres and a width of 4.2 metres