The existing road has no formal drainage, edges of seal are breaking away and potholes developing in shoulders which are requiring a high level of maintenance.Works include formalisation of roadway, including the installation of kerb and channel, stormwater drainage including pits and pipes, sealed and clear delineation of traffic lanes for safer vehicle movements, and to aline with current standards.Total cost of proposed project is $570,822
Sections damaged poor drainage and heavy traffic.Reform to restore road integrity.
re-sealing of worn surfacere-sealing of worn section of Cowell Kimba RoadTotal cost of proposed project is $139,693
Crossing not properly constructed and washed outconstruct/install culvert/creek crossingTotal cost of proposed project is $177,263
Gravel road surface pavement depleted including loss of shape.Construction of 100mm compacted depth overlay of road material to road surface.
Gravel road surface pavement depleted including loss of shape.Construction of 100mm compacted depth overlay of road material to road surface.
Gravel road surface pavement depleted including loss of shape.Construction of 100mm compacted depth overlay of road material to road surface.
Gravel road surface pavement depleted including loss of shape.Construction of 100mm compacted depth overlay of road material to road surface.
Gravel road surface pavement depleted including loss of shape.Construction of 100mm compacted depth overlay of road material to road surface.Total cost of proposed project is $57,374
Deck structure of bridge deteriorated and unstable.Repair deck structure.