Bitumen surface deteriorated and needs to be resealedReseal bitumen surface
Bitumen surface deteriorated and needs to be resealedReseal bitumen surface
The existing drainage is insufficient for water draining into Fletcher Creek. Heavy rainfall renders Myola Road impassable to traffic.To remove/replace or extend inadequate pipes. New works will include the establishment of stabilised gravel floodways, installation of box culverts, pipe extensions and earthworks to redirect runoff.
Inspections have identified that the bridge decking has deteriorated to a level that requires rehabilitation. There are currently no delineation markers in place.Replacement of timber decking, installation of delineation markers and signage.
Inspections have identified that the bridge decking has deteriorated to a level that requires rehabilitation. There are currently no delineation markers in place.Replacement of timber decking, installation of delineation markers and signage.
Inspections have identified that the bridge decking has deteriorated to a level that requires rehabilitation. There are currently no delineation markers in place.Replacement of timber decking, installation of delineation markers and signage.
Unsealed road with very high maintenance costs due to steep and windy terrain. Increased traffic volumes leading to safety concerns.Reform road, add new pavement and seal. Some localised widening and minor realignment to address safety issues. One new culvert suitable for 2 lanes to replace existing single lane culvert.Total cost of proposed project is $1,039,045
Road pavement and seal has deteriorated making the surface rough and prone to frequent potholing. Replacement of damaged culverts due to structure integrity.Road is to be rehabilitated including addition of new pavement material and reclaiming existing material to reshape and strengthen the road. A new bitumen seal will then be applied.
Replacement of damaged culvert.Total cost of proposed project is $547,322
Unsealed road with very high maintenance costs due to steep and windy terrain. Increased traffic volumes leading to safety concerns.Reform road adding new pavement and seal. Some localised widening and minor realignment to address safety concerns.Total cost of proposed project is $414,628
The gravel on the unsealed road has been consumed and requires replacement back to an as new conditionReform road and resheet apply a new layer of gravel at a depth of 100mm.Total cost of proposed project is $193,135