Rotting deck timbers and sub structureReplacement of deck with concrete and replacement of support beams with steelTotal cost of proposed project is $150,000
Unsealed urban road that is an ongoing maintenance liability. Dust and mud are an ongoing source of complaint from residents.Gravel existing alignment and bitumen seal.
Unsealed urban road that is an ongoing maintenance liability. Dust and mud are an ongoing source of complaint from residents.Gravel existing alignment and bitumen seal.
Unsealed urban road that is an ongoing maintenance liability. Dust and mud are an ongoing source of complaint from residents.Gravel existing alignment and bitumen seal.
Scope of works expanded to rectify inadequate drainage on southern side of the road. New table drain constructed and excess vegetation cleared.
Final seal over shoulder widening and rehabilitation works for correction of formation and seal width deficiency with rutting and roughness.Final seal.
Final seal over rehabilitation works to correct formation and seal width deficiency with roughness and rutting.Final seal.
Gravel surface is worn, rough and unpredictable making it unsafe. Inadequate depth of gravel remaining on road leading to poor road conditions following rain events.Reshape formation to 8m road width (where possible), construct 150mm gravel overlay, clear and reshape table drains on either side of roadway to provide adequate drainage.
Final seal over rehabilitation works to correct formation and seal width deficiency with roughness and rutting.Final seal.
Unsealed urban road that is an ongoing maintenance liability. Dust and mud are an ongoing source of complaint from residents.Gravel existing alignment and bitumen seal. Upgrade intersections with side streets and renew laybacks as required.
Unsealed urban road that is an ongoing maintenance liability. Dust and mud are an ongoing source of complaint from residents.Gravel existing alignment and bitumen seal. Upgrade intersections with side streets and renew laybacks as required. Raise sewer manholes to meet new road height.