Pavement and kerb and channel have failedReplace pavement,replace kerb and channel,replace kerb and channel,new asphalt sealTotal cost of proposed project is $190,000
Pavement seal has failedAsphalt overlayTotal cost of proposed project is $220,000
Pavement seal has failedNew asphalt sealTotal cost of proposed project is $140,000
High traffic volume on gravel road and dust nuisance to residentsWiden and treat existing subgrade,construct new gravel pavement and bitumen sealTotal cost of proposed project is $400,000
Sealed pavement has failedNew asphalt overlayTotal cost of proposed project is $300,000
Kerb and Channel has failed, causing moisture to enter the pavement which has also caused major pavement failure.Replace kerb and channel on north side and reconstruct road pavement.
Jungawa Road is extensively used by local community, cattle transport business and tourists. There is also a school and a research farm located at the road. Water is pooling in several localities presenting a significant hazard to motorists and restricting access to the school, cattle business and tourism industry.Pavement upgrade from unsealed to sealed road.
Ageing seal is cracking which allows moisture to enter the road pavement, works required to prevent major deterioration.Resurface existing seal with a bituminous binder and aggregate
Bullita Access Road provide access to two major indigenous communities and tourists. More than 5,000 tourists visit Bullita Homestead annually. Various complaints have been received from two local indigenous communities and various other road users/tourists regarding sections becoming impassable during the wet season and afterwards.Construct six concrete inverts on the Bullita Access Road at chainages 7.17, 7.36, 9.22, 9.33, 10.24 and 10.33 kilometres.
This section of road has large areas of pavement failure.The pavement of this section of sealed road needs to be cement stabilised to improve the functionality of the road.