Large diameter culvert pipe is failing, and a 2 tonne load limit has been placed on the structure.Replace the culvert pipe with a large concrete box culvert structure, generally to provide the same width of crossing as existing. Provide guard rails.
Concrete section loss through spalling, reinforcement exposed, dramatic and rapid deterioration expected unless addressed.Reinforced concrete repair works to sub-structure and underside of superstructure, corrosion protection of reinforcement, re-build lost cross-sectional area.
Spings Road is currently a dirt track. Council proposes to construct a gravel road in its place. With King Island becoming influxed with visitors, the construction of this road will improve tourism and recreational access to one of the Island's popular beaches.To construct a 200mm gravel road, 3.4km long and 5m wide. 100m of Amor guard rail will also be installed from CH1200 to CH1300.
The project involved strengthening seven bridges on the Goulburn Valley Highway from Shepparton to Tocumwal.
The project involved strengthening ten bridges on the Hume Freeway from Tallarook to Chiltern.
Insufficient road width to accommodate 2 way traffic and parked vehicles adjacent general store, purchasing store and mechanical workshop.Widening of existing roadway for car parking, works will include boxing out of existing verge, placement of barrier kerb and gravel pavement, then 2 coat bitumen seal. ** Note project comp date is June 2016 and balance in 2014-19 programme.Total cost of proposed project is $150,000
The Existing Bridge No. 614-Morrell Bridge has Structural problems and has being recommened by Main Roads/ Bridge Division to be replaced with a New StructureThe existing Bridge structure 8m wide by 14m long be removed and Replaced with a new box culvert bridge structure of the same similar size and capacity.Total cost of proposed project is $182,255
Existing pavement has badly deteriorated and is unsafe for vehicles due to the many pothole patches and irregularities on the road surfaces.Renewal of low standard pavement with minimum 80mm fine crushed rock.
The road surface is nearing the end of its useful life, with cracking and minor potholes starting to appear.Overlay with 25mm asphalt.
Deterioration of the road pavement associated with everyday usagePatch isolated failed areas and overlay with new spray seal wearing course