The existing road is deficient in strength and is breaking up in sections.Replace existing drainage and culverts. Milling and stabilisation to a depth of 200mm, 120mm thick layer of compacted finely crushed rock and finished with a two coat seal.
Surface has reached the end of its useful life and requires renewal.Resurface the road.
Surface has reached the end of its useful life and requires renewal.resurface the road.
Surface has reached the end of its useful life and requires renewal.Resurface the road.
Surface has reached the end of its useful life and requires renewal.Resurface the road.Total cost of proposed project is $116,822
Currently unsealed road with in the township of Murray Bridge.Install7.0m wide spray seal wearing course on 595m segment of Adelaide Road (Service Road)
Deteriorated road asphalt surface and substandard kerbing sectionsReseal deteriorated road surface with a 30mm stone mastic asphalt overlay and replace substandard kerbing where required to prolong the life of the asset and improve level of surface
Roadway is subject to flooding and this installation will link drainage linesInstall approx. 120 metres of 375 dia drainage pipe and construct one manhole
Pavement failures, cracking ruting shovingPulverisation, stabilisation, import 50mm of Class 2 crushed rock, reseal
Pavement failures, cracking ruting shovingPulverisation, stabilisation, reseal. Intersection works includes prime and 40 mm type N asphalt in place of the seal