The existing gravel pavement has worn down to the clay baseIt is proposed to place and compact a 100 millimetre layer of new gravel pavement
The existing gravel pavement has worn down to the clay baseIt is proposed to place and compact a 100 millimetre layer of new gravel pavement
The existing gravel shoulder pavement has worn down to the clay baseIt is proposed to place and compact a 100 millimetre layer of new gravel shoulder pavement
Due to increased traffic volumes on this gravel street the amount of raised dust as well as loose pavement material has significantly increasedIt is proposed to top up and re-compact the existing gravel pavement and then place a bitumen seal over the new pavement
Brooke Lane is unsealed and has significant dust issues in summer and slippery pavement issues in the wetter monthsIt is proposed to top up and re-shape the existing pavement and then place a bitumen seal on the new pavement. There will also be some improvement works to the existing drainage
This section of the Echuca Serpentine Road has significant areas of pavement failure, roughness and wheel trackingIt is proposed to reconstruct and seal this section including the upgrade of roadside drainage
This section of road has significant areas of pavement failure, roughness and depressionsIt is proposed to reconstruct and seal this section of pavement including all necessary drainage improvements required
This section of Dingee Road has significant areas of pavement failure and wheel trackingIt is proposed to reconstruct and seal this section of road including any drainage improvements required
This section of pavement has significant areas of pavement failure, roughness and bad crackingIt is proposed to reconstruct and seal this section of pavement and improve the drainage as necessary
This section of road is unsealed and with increased heavy vehicle traffic the maintenance has increased significantlyIt is proposed to place and compact a 150 millimetre layer of new pavement on top of the existing gravel pavement and then seal the new surface. there will also be upgrade works to the existing drainage