Road is being maintained, as a major high traffic road. Evidence of pot holes occurring if it is not resealed, with the road loosing it’s skid resistance, causing major safety concerns. Forms part of Councils asset renewal program.Reseal 2.9km at 6.1m wide.
Road is being maintained, as a high traffic road. Evidence of pot holes occurring if it is not resealed, with the road loosing it’s skid resistance, causing major safety concerns. Forms part of Councils asset renewal program.Reseal 1.9km at 6.1m wide.
Road is being maintained, as a high traffic road. Evidence of pot holes occurring if it is not resealed, with the road loosing it’s skid resistance, causing major safety concerns. Forms part of Councils asset renewal program.Reseal 1.5km at 6.1m wide.
Road is being maintained, as a major high traffic road. Evidence of pot holes occurring if it is not resealed, with the road loosing it’s skid resistance, causing major safety concerns. Forms part of Councils asset renewal program.Reseal 1.55km at 6.2m wide.
The sealed road surface has reached the end of its economic life and has significant surface cracking and potholes.Reseal approximately 6.8 km of sealed road.Total cost of proposed project is $192,304
This section of Burke street has no kerb and channel and has water ponding an erosion issuesIt is proposed to place kerb and channel along this section of Burke Street as well a upgrade the gravel shoulder and seal it up to the new kerb
The bridge abutments require repair and the guard rails do not meet current standards.Reconstruct bridge abutments and install new guard rails to meet current standards.
There is cracking in the bridge and the guard rails do not meet current standards.Repair cracks and install new guard rails to meet current standards
The guard rails do not meet current standardsInstall new guard rails to meet current standards