This section of road was fully reconstructed , widened to 8 metres, and two coat sealed in 2020/21. AS heavy haulage road, wear on some sections has acceralated more quickly than anticipated with pitting developing particularly at the westen end (SLK13.48 - 17.82).It is proposed to bring forward the scheduled reseal of this road and apply a 14mm aggregate S45R reseal over the lenght of this road to lock in the seal.
Extensive cracking and potholes. Road due for reseal to protect the underlying pavement.Supply, delivery and laying of asphalt.Total cost of proposed project is $42,549
Forrest Highway, Robertson Drive and Bussell Highway in Bunbury are experiencing congestion and safety issues due to a mix of tourist, local and freight traffic. Access to Bunbury Port for road freight is also inefficient with heavy vehicles using indirect routes and being constrained by a number of at grade intersections.
This project will construct a southern connection to Bussell Highway (Stage 2) and northern connection to Forrest Highway (Stage 3) from the existing Bunbury Outer Ring Road Stage 1 link, which was completed in May 2013.
There is poor alignment of the intersection of Orallo Road and Nareeton RoadIt is proposed to realign the intersection of Orallo Road and Nareeton Road to improve road safetyTotal cost of proposed project is $175,374
Bitumen seal is cracking and starting to fail. Reseal will stabilise the surface and give a new life of approximately 7 years.It is proposed to Reseal this section
Deterioration/failure of gravel road surfaceReform existing road surface and over lay with new gravel @ 150mmTotal cost of proposed project is $110,451