Distressed road has wide-spread potholes and extensive cracking together with damaged footpaths.Propose to re-sheet the entire length of 0.16km and the width of 12m with extensive heavy patching including re-construction of damaged footpaths.Total cost of proposed project is $120,000
Distressed road has wide-spread potholes and extensive cracking.Propose to re-sheet the entire length of 0.26km and the width of 7m with extensive heavy patching.Total cost of proposed project is $115,000
Distressed road has wide-spread potholes and extensive cracking together with damaged footpathsPropose to re-sheet the entire length of 0.1km and the width of 9m with extensive heavy patchingTotal cost of proposed project is $130,000
Distressed road has wide-spread potholes and extensive cracking.Propose to re-sheet the entire length of 0.24km and the width of 5.2m with extensive heavy patching.Total cost of proposed project is $125,000
Failed road pavement and damaged seal.Heavy Patching between 37 to 42 km.
Failing road pavement and bitumen seal.Rehabilitation between 8 to 10 km
1. Road has extreme crocodile cracking along with widespread depressions and numerous potholes.
2. The existing kerb and gutter alignment on the southern side of the road needs to be set back from the trunks of existing Norfolk Island Pine trees.
3. Existing kerb & gutter on both sides is in poor condition with poor vertical alignment.1. Reconstruct the road with a deep lift asphalt pavement.
2. Remove the existing kerb and gutter adjacent to the Norfolk Island Pine trees and install new kerb and gutter away from their trunks with an alignment that provides for indented parking bays in between.
3. Install new kerb & gutter on both sidesTotal cost of proposed project is $700,000
The current condition of the seal is poor.
To reinstate impervious membrane and skid resistance wearing course, reinstate line marking to improve safetyRehabilitation, Asphalt regulation, edge repairs and crack sealing will be
Under-taken as preparation works prior to the commencement of asphalting work reinstatement of line marking.Total cost of proposed project is $16,982
Failed Pavement and sealAsphalt overlay and line marking reinstatement- 50mm Type 14H - Mill and Fill
Failed Pavement & Seal, Depressions, Heavy Vehicle - Bus InterchangeAsphalt Overlay, Service pit adjustments, line marking reinstatement - 50mm Type 14 A10E Asphalt - Mill and Fill