Drainage and road condition and trafficable areaWork proposed for these sections are the widening of the road area and road base level adjustments for water runoff, the installation of Conrete kerbing and storm water improvements to improve access to residiential properties and eliminate holding water along these roadways.
Rough surface and soft boggy sections along sections of the roadway, off let drainage clearing and silt removal.Re-sheeting in multiple small bog hole sections - full general grading and drainage clearing for shoulder off let diversion drains.
Rough surface and soft boggy sections along sections of the roadway, off let drainage clearing and silt removal.Re-sheeting in multiple small bog hole sections - full general grading and drainage clearing for shoulder off let diversion drains
Rough surface and soft boggy sections along sections of the roadway, off let drainage clearing and silt removal.Re-sheeting in multiple small bog hole sections - full general grading and drainage clearing for shoulder off let diversion drains
Install chevron alignment markers and road edge guideposts along the length of Eversleigh Road.
Install speed humps on the full width of the road, Vehicle Activated Signage and curve warning signage.
Route traffic calming scheme treatments. Installation of splitter islands, a broken dividing line along Rodboro St, a 1.5m wide footpath along Rodboro St. Improvements to sight distance.
Restrict Penny Street access to left out only onto Avoca Street. Install a raised priority crossing across Walker Street, and a channelised right turn into Walker Street.
Road is currently gravel and the original design of the road didn't allow for the amount of heavy haulage vehicles that now utilize the road. This section of the road has corrugations and pot holes is constantly reoccurring.By sealing to road surface to 7.2 metres wide and 4 kilometers long will eliminate the problem.
Area speed limit reduced to 40km/h. Install raised zebra crossing on Fourth Ave. Installation of eight raised zebra crossings at all side road intersections with Sixth Ave. Install 2m wide shared paths.