The structure requires maintenance as well as load rating. The structure is being supported by props as all bedlogs at both abutments are unstable.Remove bridge and replace with box culverts and floodway repair.Total cost of proposed project is $93,154
Bolts have rusted from 1.5 metres above water line and below, causing the piles, whalers and braces to crack at the bolt holesReplace rusted bolts below 1.5 metres above water line, replace split whalers and bracing. General repairs and banding of piles.Total cost of proposed project is $300,080
Buchanan Creek floods Brisk Street during wet weather limiting access for local residents and to the School of Distance Education.To replace the existing concrete floodway with box culverts and seal the road surface of the approaches and the culverts.
The seal has deteriorated due to wear and tear.It is proposed to reseal the 900m section to the existing width of 6m.
The seal has deteriorated due to wear and tear.It is proposed to reseal the 1.67km section to the existing width of 6m.
The road pavement has deteriorated at several locations as indicated by signs of failures such as depressions, racking, shoving, etc. The aged bitumen spray seal requires renewal.Stabilise the deteriorated section of the pavement with a suitable stabilising agent and spray seal the entires road section.
The seal has deteriorated due to wear and tear.It is proposed to reseal the 590m section to the existing width.
The seal has deteriorated due to wear and tear.It is proposed to reseal the 390m section to the existing width.
The seal has deteriorated due to wear and tear.It is proposed to reseal the 750m section to it's existing 22m width.
The road pavement has deteriorated at several locations as indicated by signs of failures such as depressions, racking, shoving etc. The aged bitumen spray seal requires renewal.The entire section of pavement will be stabilised with a suitable stabilising agent and the road section will be spray sealed.