Pavement failures, rutting, shoving, strippingStabilise Existing Pavement & Subgrade (Lime and Cement 300mm); Asphalt wearing surface
potholes, bitumen cracking and corrugationpavement repair, resealing and line marking works
Pavement failures, cracking, rutting, shovingStabilise Existing Pavement and Subgrade (Lime and Cement 300mm); Import 100mm Pavement Material and Seal
Insufficient road base material on the unsealed road resulting in poor drainage and rough road surface for motorist to negotiate.Resheeting of the road surface with 100mm of crushed limestone sourced locally
Insufficient road base material on the unsealed road resulting in poor drainage and rough road surface for motorist to negotiate.Resheeting of the road surface with 100mm of crushed limestone sourced locally
The expansion joints and approaches to the above bridges require repairReplace the expansion joints and approach Rehabilitation for the above project site.Total cost of proposed project is $25,608
Gravel pavement is worn out. Potholes in pavement. Slippery when wet.Carry out gravel resheet.
The gravel on this section of road is seriously deficient as it has been compacted and /or depleted through hire usage and lack of maintenance. Burt Road has been subject of a five year gravel sheeting program and this section is two of the five year program to be gravel resheeted.Council proposes to prune trees to improve sight distances, clear out blocked culverts, do minor formation work and gravel sheeting 100mm thick by 10m wide to reinstate this section of road back to its original condition.
Insufficient road base material on the unsealed road resulting in poor drainage and rough road surface for motorist to negotiate.Resheeting of the road surface with 100mm of crushed limestone sourced locally
Gravel pavement is worn out. Potholes in pavement. Slippery when wet.Carry out gravel resheet.