Section of road contains insufficient pavement and requires constant maintenance worksResheet unsealed road with 100mm Class 3 crushed rock, form drains and perform localised drainage works to improve road condition in this section.
Road pavement is rutted on the wheel paths and subsided about 75%.It is proposed to excavate and reseal out of asphalt concrete.Total cost of proposed project is $64,347
The gravel shoulders on this section of road are seriously deficient of shoulder width and/or gravel depth creating a major traffic hazard. Robinson Road has been the subject of a five year shoulder widening program and this is year two of the five year program to be widened. This section of road is part of the grain cartage route to a major terminal.Council proposes to widen the formation width creating a more suitable embankment angle with a wider shoulder from the bitumen edge and in doing so making it safer for the road user.
Section of road contains insufficient pavement and requires constant maintenance worksResheet unsealed road with 100mm Class 3 crushed rock, form drains and perform localised drainage works to improve road condition in this section.
Section of road contains insufficient pavement and requires constant maintenance worksesheet unsealed road with 100mm Class 3 crushed rock, form drains and perform localised drainage works to improve road condition in this section.
Uneven surface and Kerb and Gutter prevents drainage of water during rain periods.Correction of road surface and replace sections of kerb and gutter on the south side. 265 metres long by 6 metres in width
Section of road contains insufficient pavement and requires constant maintenance worksResheet unsealed road with 100mm Class 3 crushed rock, form drains and perform localised drainage works to improve road condition in this section.
Section of road contains insufficient pavement and requires constant maintenance worksResheet unsealed road with 100mm Class 3 crushed rock, form drains and perform localised drainage works to improve road condition in this section.
Road pavement is cracked and broken about 75%.It is proposed to excavate and remove old pavement. Resurface with asphalt concrete pavement.Total cost of proposed project is $47,391
Section of road contains insufficient pavement and requires constant maintenance worksResheet unsealed road with 100mm Class 3 crushed rock, form drains and perform localised drainage works to improve road condition in this section.